Login
702-876-8660
  • Home
  • Private Planroom
  • Order Prints
  • Needs & Leads
  • Construction Events
    • Nevada Contractors Association – NCA
    • National Association of Minority Contractors – NAMC
    • Associated Builders & Contractors Nevada Chapter – ABC
    • National Association of Women in Construction – NAWIC
    • Nevada Subcontractors Association – NSA
  • Resource Directory
  • Contact Us
    • Contact Form
    • Subscribe
      • Rates
      • Free Trial
      • Subscribe Now
    • Help
      • Support Resources
      • Videos
      • CSI Reference
  •  

Ask the Expert/ Inspection

What Division is Responsible for Installing Concrete Pads for Boiler Installation?

Notebook-Team December 6, 2013

Q: According to the CSI-Construction Specifications Institute Format what division is responsible for installing concrete pads for boiler installation.

A: The UMC requires concrete pads for boilers, but the actua specifications would be in the IBC or International Building code, under Concrete Construction. Contact the CSI directly for a more specific answer.

Related Posts

Ask the Expert /

When must an intent of lien be sent to the owner of a project?

Inspection /

What are the Codes Associated with Inspections?

Ask the Expert /

How long do I have to submit a lien on a property I am owed money on?

‹ What Signage/Identification is Required Within a Building? › What is the Best Method to Prepare Time Extension

Back to Top

Location

Construction Notebook
3131 Meade Avenue, Suite B
Las Vegas, NV 89102-7885

Contact Us

Monday – Thursday 8:00 AM to 4:00 PM
Friday 8:00 AM to 12:00 PM
Phone: (702) 876-8660
Fax: (702) 876-5683
Contact us

More Info

  • Advertising Rates
  • Media Kit
  • Minority Ads
  • Minority Ad Request Form
  • Post a Project
  • Industry Question?
© 2026